This case was referred back to the special master for two purposes — one to have a remeasurement made of the work in controversy, and the other to ascertain more definitely the amount upon which the 10 per centum provided by the contract was reserved by the road commissioners. After some difficulty two civil engineers, W. A. Park and P. M. Feltham, both apparently quite competent for the work, and found to be so by the master, were selected and entered upon the work of remeasurement. They finished the work, and made a report, in which they agreed that, while they had considerable difficulty in making this remeasurement, it was at least approximately correct. Mr. P. M. Feltham, one of the civil engineers, says that 90 per cent, of it is reasonably correct, and the other 10 per cent, was as nearly so as they could make it. In his second report the special master rejects this remeasurement entirely, and goes back to his original method of reaching the amount due Blassingame; that is, by assuming that a team attached to a scraper would remove 40 cubic yards of earth per day, and allowing 25 working days to a month. Adhering to this method, he finds that Blassingame was underestimated for work done of the Pigeon road $1,015.08, for work done of’ the Clyde road, $1,409.10, and for work done on the Jonathan Creek road, $1,474.33, making a total of $3,898.51. I was not satisfied on the former hearing, and-before the remeasurement was made, with this method of finding out whether or not Blassingame was underestimated, and the extent of the same, if there was such underestimate. A more careful examination óf the matter and further reflection has convinced me that this method of reaching the truth of the case is wholly unreliable.' In the testimony given by Mr. Park, one of the civil en-
Here we have the opinion of a civil engineer of ability and 25 years’ experience, and who has done a large amount of work such as that now under investigation, who says that he allows 22 working days to a month, and 27% cubic yards in round numbers of earth removed by a team per day, which shows, assuming him to be fair and unbiased, which I think he is, how unsafe it would be to adopt the figures used by the special master in his calculation as to wliat Blassingame’s estimate should have been. In view of the fact that we have now something upon which we can properly act and base a calculation as to.the state of the account between Blassingame and the road commissioners, and inasmuch as this is in line with what was contemplated by the contract, it seems to me it would be clearly wrong to adhere to the master’s method of reaching a result. ■ • •
Upon the remeasurement, these engineers agree in finding a difference in favor of Blassingame, as I find it, of $843.33%.' They make certain deductions for drain openings and rock upon all the roads and for yardage from Main street to Richland Creek bridge on the Jonathan Creek road. They do not make any deduction for what counsel for the road commissioners call “foundation excavation.” 1 do not clearly understand this latter claim. The contention is that it should reduce the amount of difference in value between the present measurement and the old measurement to $648.10. In view of the fact that the master finds that Blassingame was underestimated- in a much larger amount than this, I shall yield something to that, and allow the whole amount of the difference between the report of the engineers making this remeasurement and the amount allowed Bias-
Costs in this case should be apportioned as heretofore ordered; that ,is, each party should pay half of the costs incurred including the amount allowed the master, stenographer’s fee, witness fees, and all court costs. Of course, the amount paid the engineers to make this remeasurement must be paid by the r.oad commissioners as they agreed in open court. The special master will be allowed an additional sum of $200 for his services in connection with the rehearing. The result of what has been stated is that the exceptions to the report of the special master must be sustained, except as to his finding as to the amount of the 10 per cent, reserved ($1,889.26.) in the hands of the road commissioners. This exception will be overruled.
A decree will be entered in accordance with what has been stated above.
Decree will be entered in favor of the complainant for:
10 per cent, reserved.$1,889.20
Interest at 6 per cent, to January 29, 1909. 212.53 ,$2,101.79
Underestimate according to remeasurement. 843.325
Interest at 6 per cent, from January 1, 1905, to date. 206.478 1,049.80
Making a total of.....$3,151.59