Infiniti Information Solutions, LLC v. United States
Opinion of the Court
OPINION AND ORDER
This is a post-award protest of a contract to perform internet and intranet services for the Depai’tment of Housing and Urban Development (“HUD”), Office of Public and Indian Housing (“PIH”), issued pursuant to Section 8(a) of the Small Business Act, 15 U.S.C. § 637(a). The contract, (No. C-DEN-02418), was awarded to Ideogenics, LLC (“Ideogenics”) on September 29, 2009, and called for payment of $973,302.00 for the first year of services. The protestor, Infiniti Information Solutions, LLC (“Infiniti”), had been the incumbent contractor and was among the entities seeking the award of the new contract. After the award to its competitor, Infiniti filed a protest with the Government Accountability Office (“GAO”), which was denied. Thereafter, Infiniti filed its protest in this court.
The administrative record in this case was provided on November 20, 2009, and cross-motions for judgment on that record and a
FACTS
A. Small Business Act Requirements
The Small Business Act was enacted to “promote the business development of small business concerns owned and controlled by socially and economically disadvantaged individuals” and to “clarify and expand the program for the procurement by the United States of articles, supplies, services, materials, and construction work from small business concerns owned by socially and economically disadvantaged individuals.” 15 U.S.C. § 631(f)(2); see also 15 U.S.C. § 637(a)(5), (6) (defining “socially disadvantaged individuals” and “economically disadvantaged individuals”); John Cibinic, Jr. & Ralph C. Nash, Jr., Formation of Government Contracts 1429-32 (3d ed. 1998) (explaining eligibility criteria for participation in the Section 8(a) program).
Section 8(a) authorizes the Small Business Administration (“SBA”) to enter into procurement contracts with other federal agencies and to subcontract performance of these contracts to disadvantaged small businesses. See Pub.L. No. 85-536, § 8(a), 72 Stat. 384, 389 (1958) (codified as amended at 15 U.S.C. § 637(a)).
SBA’s acceptance of an 8(a) procurement is governed by 13 C.F.R. § 124.503. Of particular relevance to Infiniti’s bid protest, 13 C.F.R. § 124.503(e) provides that
Except for requirements for architectural and engineering services, SBA will not authorize formal technical evaluations for sole source 8(a) requirements. A procuring activity:
(1) Must request that a procurement be a competitive 8(a) award if it requires formal technical evaluations of more than one Participant for a requirement below the applicable competitive threshold amount; and (2) May conduct informal assessments of several Participants’ capabilities to perform a specific requirement, so long as the statement of work for the requirement is not released to any of the Participants being assessed.
(Emphasis added.) Further, SBA will not accept the procurement if limiting circumstances exist, as described in 13 C.F.R. § 124.504, including where “[t]he procuring activity ... expressed publicly a clear intent to reserve the procurement as a small business or small disadvantaged business (SDB) set-aside prior to offering the requirement to SBA for an award as an 8(a) contract,” 13 C.F.R. § 124.504(a), and where “[t]he procuring activity competed a requirement among Participants prior to offering the requirement to SBA and receiving SBA’s formal acceptance of the requirement.” 13 C.F.R. § 125.504(b).
B. Prior Awards to Infiniti
This case arises from HUD’s requirement for internal and external website support services for PIH. See AR 2-000006 (Market Research Questionnaire). Under two sequential Section 8(a) sole-source contracts, Infiniti performed these services from 2005 until the second contract expired on September 19, 2009. AR 9C-000351 at ¶¶ 3-5 (Deck of Sharon L. Kadinger, Contract Specialist, Western Field Office of Contracting Operations, HUD (Sept. 11, 2009));
Effective January 30, 2007, SBA entered into a Partnership Agreement with HUD that provided for delegation of SBA’s authority to enter into prime contracts under Section 8(a) of the Small Business Act. See AR 9D-000355 to 000361 (Partnership Agreement). By that Agreement, SBA “delegate[d] only the contract execution function,” while SBA “remain[ed] the prime contractor on all 8(a) contracts, and the 8(a) participant remain[ed] SBA’s subcontractor.” Id. at 000356 (¶ IV.A.1). In entering into the Agreement, HUD bound itself to “adhere to all provisions of contractual assistance identified in 13 C.F.R. parts 124.501 through 124.520, as well as the applicable provisions of FAR 48 part 19.” Id. at 000358 (¶ IV.B.2). The Agreement remained in effect until September 30, 2009. Id. at 000360 (Art. V).
During the Spring of 2009, HUD began developing a so-called “vendor list” for the PIH contract, which was completed on June 10, 2009. See AR Supp. 15-000512 to 000514 (Request to Consider the Following Vendors for an 8(a) Direct Award (June 10, 2009)).
On June 11, 2009, Susan Adams, Contract Oversight Specialist for HUD and PIH, emailed eleven vendors to schedule interviews with a panel comprised of herself and two
Some of the interviewees, as well as other firms who had expressed an interest in the procurement in connection with HUD’s development of the vendor list, posed queries to Ms. Adams regarding the acquisition sti’ate-gy and process. See, e.g., AR Supp. 16-000562 (E-mail from Ideogenics to Ms. Adams (May 27, 2009)) (“I understand that this is going to be an 8(a) direct award, correct?”); AR Supp. 17-000657 (E-mail from Jackie Robinson & Associates to Ms. Adams (June 22, 2009)) (“inquiring what the process was”); AR 7B-000124 (E-mail from Shiva Information Technology Services to Ms. Adams (June 22, 2009)) (“I am not clear about the procurement strategy listed as 8(a) direct [] and also Service Disabled/Veteran Owned. We are an 8(a) company but not SDVOB. Will we qualify for this procurement?”). In response to questions regarding whether Service Disabled/Veteran Owned (“SDVO”) was a requirement, Ms. Adams stated that SDVO was “just a preference.” See, e.g., AR Supp. 16-000530 (E-mail from Ms. Adams to Imagine One Technology (Apr. 2, 2009)); but see AR Supp. 17-000626 (Email from Ms. Adams to Mr. Strayhorn (June 16, 2009)) (additional vendor unlikely to be added for review because not a SDVO).
Infiniti’s presentation to the panel was scheduled for June 22, 2009. See AR 6G-000112 (E-mail from Ms. Adams to Infiniti (June 11, 2009)). That presentation included information on the identity and qualifications of key members of its “project support team,” the company’s major accomplishments, and the benefits of selecting Infiniti for the follow-on contract. AR 7F-000139 to 000149 (Infiniti’s Presentation for HUD (June 22, 2009)). Infiniti submitted a list of references and the resumes of five of the six members of its “project support team,” see id. at 000143, Vinay P. Jain, Project Manager and Technical Lead, Maurice L. Chesley, Alternative Project Manager, Adam Young, Senior Analyst and Web Developer, Charmaine Patterson, Senior Analyst and Web Developer, and Kimberly Williams, Analyst and Web Developer. AR 7F-000153 to 000163 (Resumes of Mr. Jain, Mr. Chesley, Mr. Young, Ms. Patterson, and Ms. Williams, plus references). The government has characterized as “market research” the process by which vendors made presentations to HUD in response to a draft statement of work and submitted answers to a set of interview questions and resumes of key personnel. See, e.g., Def.’s Mot. to Dismiss, or, in the Alternative, Def.’s Resp. to Pl.’s Mot. for Judgment upon the Administrative Record and Cross Mot. for Judgment upon the Administrative Record at 3 (“Def.’s Cross-Mot.”).
The panel’s evaluation of the vendors’ presentations was relatively formal but nonetheless did not reflect the full panoply of steps customarily attendant to a competitive procurement. One of the interview panelists,
The observations Mr. Strayhorn submitted to Ms. Adams included the criteria and evaluations of the vendors. AR 13A-000478 (Email from Mr. Strayhorn to Ms. Adams (July 14, 2009)). In a post hoc declaration submitted to the court, Ms. Adams stated that although “parts of Mr. Strayhorn’s narratives were used in the panel’s narrative summary” which was submitted to Mr. Brown for his recommendation to Assistant Secretary Sandra B. Henriquez, the individual responsible for approving PIH’s suggested contractor for transmission to SBA’s Contracting Office, “[Mr. Strayhorn’s] evaluation scheme and scoring system were not incorporated in the market research panel’s narrative summary.” AR 14B-000496 (Decl. of Ms. Adams, Senior Contract Oversight Specialist, PIH, HUD (Nov. 13, 2009)). A post hoc declaration submitted by Mr. Jones stated that “[a]t no time was I instructed to use evaluation factors in the market research process, and at no time during the market research process was I instructed that the Procurement was a competitive acquisition.” AR 14C-000498 (Decl. of Mr. Jones, Management Information Specialist, PIH, HUD (Nov. 13, 2009)); see also AR 14B-000495 to 000496 (Decl. of Ms. Adams) (same). The supervisor of the panel, Mr. Brown, submitted a post hoc declaration to the same effect, stating that “[a]t no time during the course of this procurement did I ask Ms. Adams, Mr. Jones[,] or Mr. Stray-horn to use any evaluation criteria, or assign a number score to any of the firms.” AR 14A-000493 (Decl. of Mr. Brown, Chief Contract Oversight Officer, PIH, HUD (Nov. 13, 2009)).
D. Protest Before GAO
In its protest filed with GAO, Infiniti claimed that HUD awarded “an illegal sole source contract without affording Infiniti the protections and procedures set forth in the FAR supporting such anti-competitive awards.” AR 12A-000414 to 000415 (GAO Protest). Alternatively, Infiniti argued that “to the extent that the Comptroller General finds that the award to Ideogenics was done on a competitive basis, the award decision must be overturned because it was made on the basis of unstated evaluation criteria and not on the basis of a fair and reasonable evaluation.” Id. at 000415. HUD responded by moving for dismissal based upon lack of jurisdiction and Infiniti’s failure to state legally sufficient grounds for the protest. AR 12B-000440 (Government’s Request for Dismissal of GAO Protest (Sept. 11, 2009)). On September 24, 2009, GAO dismissed the protest, AR 12F-000476 (GAO Decision (Sept. 24, 2009)), concluding that “no solicitation was issued” because “there was neither a finalized statement of work [released to all the participants] nor a list of evaluation factors for award.” Id. GAO considered that the draft SOW that was provided to the eleven vendors prior to the interviews constituted a “synopsis of the anticipated requirement,” and viewed the information requested by HUD on each company’s experience, key personnel, and other capability information as falling within the ambit of permissible market research allowed by 13 C.F.R. § 124.503(e)(2). Id. at 000476 to 000477.
STANDARDS FOR DECISION
This court adheres to the standards specified in the Administrative Procedure Act (“APA”), 5 U.S.C. § 706, when deciding a bid protest. See 28 U.S.C. § 1491(b)(4) (“In any action under this subsection, the courts shall review the agency’s decision pursuant to the standards set forth in section 706 of title 5.”). Under the APA, this court may set aside an agency decision such as an award of a contract if the decision is “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” 5 U.S.C. § 706(2)(A). This standard of review is “highly deferential” to the agency’s procurement decision, Advanced Data Concepts, Inc. v. United States, 216 F.3d 1054, 1058 (Fed.Cir. 2000), and the court accords the agency’s decision a “ ‘presumption of regularity.’ ” Emery Worldwide Airlines, Inc. v. United States, 264 F.3d 1071, 1085 (Fed.Cir. 2001) (quoting Citizens to Preserve Overton Park, 401 U.S. at 415, 91 S.Ct. 814, abrogated in part by Califano v. Sanders, 430 U.S. 99, 105, 97 S.Ct. 980, 51 L.Ed.2d 192 (1977) (abrogating the portion of Overton Park that recognized the APA as an independent grant of subject matter jurisdiction)).
The court reviews the agency’s decision based upon the administrative record of the procurement. See RCFC 52.1(a); Bannum, 404 F.3d at 1355-57. If the agency’s action “evinc[es] rational reasoning and consideration of relevant factors,” the court will sustain the action. Advanced Data Concepts, 216 F.3d at 1058. The agency’s deci
THE ADMINISTRATIVE RECORD
Infiniti filed its complaint in this court on November 3, 2009. The administrative record was provided November 20, 2009, and the parties thereafter submitted their cross-motions and briefs on an expedited basis. Upon review of the briefs in light of the administrative record, and before the case had been submitted for decision, the court concluded that certain documentary materials had apparently been overlooked or omitted from the record as filed. Accordingly, in an order dated March 10, 2010, the court invoked RCFC Appendix C, ¶ 24,
ANALYSIS
A. A Question of Waiver
The government has moved to dismiss this case, arguing that Infiniti has waived its right to challenge the award in this matter because Infiniti filed its bid protest after HUD awarded the contract to Ideogenics. Def.’s Cross-Mot. at 13-15.
The application of Blue & Gold Fleet to this bid protest action turns on whether ambiguities found in the procurement documents which underlie Infiniti’s claims were “patent,” thus triggering Infiniti’s duty to seek clarification from the government prior to the scheduled interviews. See Blue & Gold Fleet, 492 F.3d at 1313. Arguably, the forecast issued by HUD on June 8, 2009 was ambiguous as to whether the contract was to be awarded on a competitive or sole-source basis. See supra, at 7. Indeed, other contractors e-mailed Ms. Adams for clarification regarding the acquisition strategy. See, e.g., AR Supp. 16-000562 (E-mail from Ideogenics to Ms. Adams (May 27, 2009)) (“I understand that this is going to be an 8a direct award, correct?”). However, Infiniti’s protest is not based on this aspect of the notices; rather, Infiniti argues that what HUD did in its subsequent actions to determine the awardee contravened SBA’s regulations. Infiniti had no reason to question HUD’s notices because it qualified under Section 8(a) and was a SDVO Small Business. Accordingly, Infiniti did not waive its right to mount a challenge based upon SBA’s regulations to an award made under Section 8(a) to a non-SDVO.
B. Questions of Compliance with SBA’s Rules
1. Applicability of SBA’s mies.
Section 8(a) authorizes the creation of a Minority Small Business and Capital Ownership Development program (“8(a) BD” program). 13 C.F.R. § 124.1. The stated purpose of the 8(a) BD program is “to assist eligible small disadvantaged business concerns compete in the American economy through business development.” Id. To be eligible for admission to the 8(a) BD program, a business concern must be “a small business which is unconditionally owned and controlled by one or more socially and economically disadvantaged individuals who are of good character and citizens of the United States, and which demonstrates potential for success.” 13 C.F.R. § 124.101. As discussed previously, “[w]here appropriate,” SBA will delegate to a federal agency the ability to contract directly with the 8(a) business, but “to receive and retain a delegation ..., a procuring activity must report all 8(a) contract awards, modifications, and options to SBA.” 13 C.F.R. § 124.501(a); see also 13 C.F.R. § 124.503(a)(4)(ii) (“Where SBA has delegated its 8(a) contract execution functions to an agency, SBA may authorize the procuring activity to award an 8(a) contract without requiring an offer and acceptance of the requirement for the 8(a) program.”). The delegation cai’ries with it the obligation to adhere to SBA’s rules for 8(a) direct awards. See AR 9D-000358 (Partnership Agreement, ¶ IV.B.2); Hr’g Tr. 58:8-21. This responsibility includes the obligation of the contracting officer to “consider setting aside the requirement for HUBZone, 8(a) or SDVO SBC participation before considering to set aside the requirement as a small business set-aside.” 13 C.F.R. § 124.503(j).
Although HUD’s initial approach to the procurement was to award the contract as a “[c]ompetitive 8(a) [s]et [a]side,” see AR 3-000022 (May Forecast), this strategy was changed to “8(a) direct.” See AR 3-000024 (June Forecast). An 8(a) direct award can be made on either a competitive or a sole-source basis, and the final forecast in June was consequently ambiguous on the basis for award within the ambit of SBA’s 8(a) rules. By contrast, both the May and June forecasts were specific that the “Service Disabled/Veteran Owned” criterion would apply because that notation appeared in parentheses under the acquisition strategy in both notices. Five of the eleven vendors included on the vendor list signed by Mr. Brown on June 10, 2009 were SDVO. See AR Supp. 15-000514 (Request to Consider the Following Vendors for an 8(a) Direct Award).
Infiniti’s primary challenge to the award focuses on HUD’s compliance with SBA Regulation 13 C.F.R. § 124.503(e), which allows “informal assessments of several Participants’ capabilities to perform a specific requirement,” rather than a formal competition, “so long as the statement of work for the requirement is not released to any of the Participants being assessed.” Infiniti’s chief argument with regard to this regulation is that HUD released a statement of work to the eleven contractors who participated in the “market research process,” thus effectively conducting an illegal competition in violation of the rule. See PL’s Resp. at 9-12. The government responded that the statement of work released to the eleven participants was a “draft,” and was referred to as such in the e-mails sent on June 11, 2009 to the eleven participants. See Def.’s Reply at 4 (“The draft statement of work ... was not the actual statement of work for the contract that HUD negotiated with Ideogenics.”); but cf. AR Supp. at 17-000606 (E-mail from Ms. Adams to Advantage Industries, Inc. (June 12, 2009)) (“The date [for your presentation] is June 22 @ 1 pm. Did you receive my email with the SOW and interview questions?”).
Whatever were HUD’s intentions in releasing the so-called “draft statement of work,” some uncertainty and confusion was created by the process, as evidenced by the multiple e-mail queries from participating entities to Ms. Adams on the subject. See, e.g., AR 7B-000124 (E-mail from Shiva, Inc. to Ms. Adams (June 22, 2009)) (“I am not clear about the procurement strategy.”); AR 7K-000265 (E-mail from Ideogenics to Ms. Adams (May 27, 2009)) (“I understand that this is going to be an 8(a) direct award, correct?”); AR Supp. 16-000593 (E-mail from Jackie Robinson & Associates to Ms. Adams (June 9, 2009)) (“Will we have a[] SOW [prior to the presentation] or are we just expected to give the audience our experience in Web development and maintenance?”); AR Supp. 17-000654 (E-mail from Jackie Robinson & Associates to Ms. Adams (June 18, 2009)) (“Can you help me understand the process they will use to select the vendor? Do the three of you who interviewed us make a set of recommendations to Denver and then they select the vendor, or how is the selection done?”).
The court has relatively little precedent upon which to draw in determining whether HUD’s release of the so-called “draft statement of work” contravened the pertinent SBA regulation, 13 C.F.R. § 124.503(e)(2). The parties referred specifically to two decisions by the General Services Administration Board of Contract Appeals — Dynamic Decisions, Inc. v. Department of Health & Human Servs., 95-2 B.C.A. ¶ 27,732, GSBCA Nos. 13170-P & 13171-P, 1995 WL 314827 (May 4, 1995), and Electronic Sys. & Assocs., Inc. v. Department of the Air Force, 93-1 B.C.A. ¶ 25,278, GSBCA No. 11833-P, 1992 WL 165562 (July 15, 1992)
Dynamic Decisions and Electronic Systems hold that when a statement of work is given to vendors prior to the time that a review is undertaken, the procurement must be competed. See Dynamic Decisions, 1995 WL 314827, 1995 GSBCA LEXIS 167, at *47 (sustaining a protest against the Public Health Service where the agency invited five companies to make oral presentations based on a statement of work and failed to inform SBA of its actions when recommending sole-source awards);
Factually, the work statement made part of the Ideogenies contract does not differ in any material respect from the draft statement of work sent by e-mail to the vendors. Vendors were provided with Section C.l. entitled “Background,” Section C.2. entitled “Purpose and Objective,” and Section C.3. entitled “Scope of Work.” Each of these sections is virtually identical, word for word, in both documents, although the Scope of Work is renumbered as Section C.9. in the actual contract that was awarded Ideogenies. Compare AR 6H-000115 to 000118 (“draft SOW’), with AR 11-000370 to 000374 (Ideo-genies Contract). Sections C.3. through C.8. in the Ideogenies contract do not appear in the draft statement of work sent to vendors, but those sections relate to, respectively, “Abbreviations, Definitions, and Applicable Doeuments/Publications” (§ C.3), “Government Furnished Property” (§ C.4), “Contractor Furnished Items and Services” (§ C.5), “36 C.F.R. § 1194.31, ... Access Board [] Standards” (§ C.6), “Deliverables” (§ C.7), and “General” (§ C.8). Compare AR 6H-000115 to 000118 (draft SOW), with AR 11-000371 to 000373 (Ideogenies Contract). Factually, these sections are ancillary to the scope of work to be performed under the contract. The government argues that the “Deliverables” section could hardly be ancillary to the statement of work, see Hr’g Tr.
Substantively, the scope of work to be performed under the contract is divided into two tasks: Task 1 deals with “daily internet/intranet support for PIH Headquarters offices,” AR 6H-000116 (draft SOW); AR 11-000373 (Ideogenics Contract); Task 2 addresses “PHA Plan internet/intranet maintenance and posting support, system process enhancements and [maintenance] [of] on-going processes on a daily basis.” AR 6H-000117 (SOW); AR 11-000374 (Ideogenics Contract). The recitation of these tasks is virtually identical in both the draft SOW and the contract as awarded. With regal’d to the Task 1, apart from a few word changes, the two documents are identical. The descriptive text for Task 2 is also virtually identical, except that the draft SOW contained an additional requirement — to “monitor, process, and resolve all email inquires in the ‘pihpha-lans’ inbox” — that appears to have been omitted from the contract awarded to Ideogenics. Compare AR 6H-000117, § 3.2.1 (draft SOW), with AR 11-000374 (Ideogenics Contract). Accordingly, the court finds that the document HUD e-mailed to the eleven vendors constituted a statement of work in contravention of SBA Regulation 13 C.F.R. § 124.503(e)(2), making the award of the PIH contract to Ideogenics contrary to law.
A second challenged aspect of the procurement at issue tests HUD’s award against its published strategy for the procurement. In both the May and June forecasts, HUD listed “Service Disabled/Veteran Owned” in parentheses beneath the acquisition strategy. This listing engendered confusion, and some of the vendors posed questions to Susan Adams on this point. See supra, at 7. As noted previously, Ms. Adams responded that SDVO was a “preference.” That SDVO was just a preference was not evident from the forecasts; instead, the forecasts denote the opposite conclusion: that SDVO was a mandatory qualification. The government’s contention that the forecasts were at least ambiguous on this point, see Hr’g Tr. 36:23 to 37:16, reads more into the forecasts than appears on their face. Moreover, establishing such a qualifying requirement would have been consistent with 13 C.F.R. § 124.503(j), quoted supra, which required HUD to consider a set aside for disadvantaged firms, including SDVO entities. Further, HUD’s responses to the queries regarding the acquisition strategy were not provided to the non-inquiring participants, only to those who raised the questions. See Hr’g Tr. 13:23 to 15:5. Infiniti and other entities who qualified as SDVOs thus had no inkling of HUD’s consideration of non-SDVO firms. HUD’s actions with regard to the SDVO “preference” were consequently arbitrary and capricious, and prejudicial to those vendors such as Infiniti who assumed, reasonably, that there was no ambiguity as to whether SDVO was a requirement.
Having found HUD’s evaluation and recommendation of Ideogenics to be contrary to law and arbitrary and capricious on two separate and independent grounds, it is not necessary to reach Infiniti’s claims that other aspects of the procurement were unlawful, such as the rating of vendors or bias against Infiniti.
CONCLUSION
For the reasons stated, Infiniti’s motion for judgment on the administrative record is GRANTED. The government’s motions to dismiss and for judgment on the administra
The parties were requested to review this decision and to file proposed redactions on or before April 8, 2010. No redactions were sought.
It is so ORDERED.
. Because this opinion and order might have contained confidential or proprietary information within the meaning of Rule 26(c)(1)(G) of the Rules of the Court of Federal Claims ("RCFC") and the protective order entered in this case, it was initially filed under seal. The parties were requested to review this decision and to provide proposed redactions of any confidential or proprietary information on or before April 8, 2010. No redactions were requested. In connection with its response to the request regarding redactions, the government by motion sought correction of three clerical errors in the decision as filed under seal. That motion is granted and pertinent changes have been made.
. The recitations that follow constitute findings of fact by the court drawn from the administrative record of the procurement and the parties’ evidentiary submissions related to prejudice and equitable relief. See Bannum, Inc. v. United States, 404 F.3d 1346, 1356 (Fed.Cir. 2005) (bid protest proceedings “provide for trial on a paper record, allowing fact-finding by the trial court”); Santiago v. United States, 75 Fed.Cl. 649, 653 (2007) (“In accord with RCFC 52.1, the court 'is required to make factual findings ... from the Ladminislrative] record as if it were conducting a trial on the record.’ ”) (quoting Acevedo v. United States, 216 Fed.Appx. 977, 979 (Fed.Cir. 2007)).
Other findings of fact and mixed findings of fact and conclusions of law are stated in the analysis which follows.
. Although a contract entered pursuant to Section 8(a) is technically a contract between the procuring agency and SBA, with a subcontract between SBA and the Section 8(a) participant, ”[a]fter award, the relationships under an 8(a) contract are principally between the 8(a) firm and the procuring agency[,] ... [with] the SBA ... no longer directly involved.” Cibinic & Nash, supra, at 1433. In this respect, by regulation, a subcontract between the 8(a) awardee and SBA provides that "the SBA has delegated responsibility ... for the administration of this subcontract to the [contracting agency] with complete authority to take any action on behalf of the Government under the terms and conditions of this contract.” 48 C.F.R. § 52.219-12(b)(2).
. "The Federal Acquisition Regulatory Council (FAR Council) has the responsibility of adjusting each acquisition-related dollar threshold on October 1 of each year that is evenly divisible by five.” 13 C.F.R. § 124.506(a)(1). SBA’s regulations were amended on September 14, 2009 to raise the threshold for manufacturing contracts to $5,500,000 and that for all other contracts to $3,500,000. See 74 Fed.Reg. 46885-01 (Sept. 14, 2009) (interim final rule with an immediate effective date) (amending and renumbering 13 C.F.R. § 124.506(a)(1) (2009) as 13 C.F.R. § 124.506(a)(2)).
. "AR -" refers to the administrative record filed with this court in accordance with RCFC 52.1 (a). The administrative record has been subdivided into tabs. The first number and, where applicable, letter in a citation to the administrative record refers to a particular tab, and the number after the hyphen refers to the particular page number of the administrative record, e.g., "AR 5A-000026.” The pages of the administrative record are paginated sequentially without regard to the tabs.
References to the hearing conducted on March 16, 2010, will be to "Hr’g Tr.-" without further annotation as to the date of the hearing.
. Although Ms. Kadinger’s declaration post-dated the procurement action, the declaration was submitted in connection with the protest before GAO, and thus the government included it in the administrative record. See RCFC App. C, 11 22(u); see also Holloway & Co. v. United States, 87 Fed.Cl. 381, 391-392 (2009) (applying RCFC Appendix C, ¶ 22(u), to accept as part of the administrative record materials that were incorporated into the record developed before GAO in a prior protest of the pertinent award); cf. Allied Technology Group, Inc. v. United States, 92 Fed.Cl. 226, 229-31, 2010 WL 1388162, at *3-4 (2010) (applying RCFC Appendix C, 1122(u), and adjusting the administrative record to accept some, but reject other, materials that were generated for, and filed in, a prior protest before GAO).
. Infiniti avers that in February 2008, its owner, Gus Bell, met with Lafonda Lewis, HUD’s Senior Contract Oversight Specialist at the time. AR
. As discussed infra, the court invoked RCFC Appendix C, ¶ 24, to request that the government supplement the record to flesh out obvious gaps in the documentary materials that had been provided. The government cogently and promptly responded with the requested additional materials, as a supplement to the administrative record. References to the supplemental record will be to “AR Supp.-."
. The notice dated June 8, 2009 did not state that the contract would be awarded on a sole-source basis; rather, by indicating that the award would be "direct,” HUD meant that it would award the contract directly to a Section 8(a) firm, in accord with its delegation. See United States Department of Housing and Urban Development, Office of the Chief Procurement Officer, Class Deviation to Federal Acquisition Regulation Subpart 19.8 and Part 52, Section 8(a) Awards, at 2 (Sept. 5, 2007) ("FAR 19.800 paragraph (f) is replaced with the following: ... Under the Partnership Agreement, a contract may be awarded directly to an 8(a) firm on either a sole source or competitive basis.”). The government contended that the forecast was ambiguous on this point and that Infiniti should have asked HUD for clarification. Hr'gTr. 30:22 to 31:8, 35:6-12.
. Declarations by members of the panel were executed in mid-November 2009, after this case had been filed, and were included by the government in the administrative record. See AR 14B-000495 to 14D-000500. However, the declarations themselves manifestly were not part of the contemporaneous record of this procurement. Accordingly, this is an instance where "supplementary declarations and testimony at trial may reflect wisdom gained by hindsight and may not represent individuals' actual bases for making decisions during the procurement.” Systems Plus, Inc. v. United States, 69 Fed.Cl. 757, 765 n. 5 (2006).
In these circumstances, the reviewing court should be mindful to examine critically any post hoc rationalizations for the agency action. See Citizens to Preserve Overton Park, Inc. v. Volpe, 401 U.S. 402, 420, 91 S.Ct. 814, 28 L.Ed.2d 136 (1971); Vermont Yankee Nuclear Power Corp. v. Natural Res. Def. Council, Inc., 435 U.S. 519, 549, 98 S.Ct. 1197, 55 L.Ed.2d 460 (1978); Co-Steel Raritan, Inc. v. International Trade Comm’n, 357 F.3d 1294, 1316 (Fed.Cir. 2004); PGBA, LLC v. United States, 60 Fed.Cl. 196, 204 (2004), aff'd, 389 F.3d 1219 (Fed.Cir. 2004).
. RCFC Appendix C, 1124, requires that "[a]ny additional documents within the administrative record [beyond those already produced as part of the record pursuant to RCFC Appendix C, VII 21-23] must be produced at such times as may be agreed to by the parties or ordered by the court.”
. Initially, the government also moved to dismiss Infiniti’s complaint on the grounds of lack of subject matter jurisdiction, arguing that Infini-ti is not an “interested party,” Def.'s CrossMot. at 10-13, as required by statute to pursue a bid protest. See 28 U.S.C. § 1491(b)(1) (granting this court "jurisdiction to render judgment on an action by an interested party objecting to a solicitation by a Federal agency for bids or proposals for a proposed contract or to a proposed award or the award of a contract or any alleged violation of statute or regulation in connection with a procurement or a proposed procurement" (emphasis added)). Subsequently, the government withdrew this contention. See Def.'s Reply at 1 n. 1; Hr'gTr. 28:14-16.
. As a result of the government’s response to the court's request for supplementation of the administrative record pursuant to RCFC Appendix C, ¶ 24, the court has a significantly more extensive record than that which was before GAO at the time of its decision.
. In 1984, the General Services Administration Board of Contract Appeals ("GSBCA”) was granted jurisdiction to hear bid protest cases, exclusive as to federal data processing contracts. See Competition in Contracting Act of 1984, Pub.L. No. 98-369, § 2713, 98 Slat. 1175, 1182 (1984) (codified as amended at 40 U.S.C.
For details regarding pre-repeal statutory adjustments in GSBCA's bid-protest jurisdiction, see William L. Murphy, The Federal Circuit and the GSBCA: Review of Protest Decisions, 40 Am. U.L.Rev. 1065 (1991). On January 6, 2007, the GSBCA ceased to exist, and its cases were transferred to the newly created Civilian Board of Contract Appeals. See National Defense Authorization Act for Fiscal Year 2006, Pub.L. No. 109-163, § 847, 119 Stat. 3136, 3391 (2006).
. In Dynamics Decisions, the GSBCA also concluded that evaluation by a panel of agency officials of capability statements, resumes of proposed personnel, references, and oral presentations made to the panel "constitute^] formal technical evaluations.” 1995 WL 314827, 1995 GSBCA LEXIS 167, at *47.
. To establish prejudice, and thus grounds for relief under 28 U.S.C. § 1491(b)(2), a protestor must "demonstrate more than a 'mere possibility that [it] would have received the contract but for the error[s] [in the procurement process].' ” Asia Pac. Airlines v. United States, 68 Fed.Cl. 8, 18 (2005) (quoting Data Gen. Corp. v. Johnson, 78 F.3d 1556, 1562 (Fed.Cir. 1996)). Because Infiniti was the highest rated vendor by at least one member of the review panel and was qualified as a "SDVO” entity, it has made the requisite showing of prejudice.