Schrader v. Division of Highways
Opinion of the Court
Claimants brought this action for damage sustained to their real property from a landslide allegedly
caused by the negligent maintenance of the drainage system on U. S. Route 19. U. S. Route 19 is a road maintained by respondent in Marion County. The Court is of the opinion to deny this claim for the reasons more fully set forth below.
In 1964 claimants purchased their residence which is situated approximately thirty feet below the road surface of U. S. Route 19, near Fairmont. U. S. Route 19 is a priority road that generally traverses in a north-south direction, but at this location the road traverses east-west. The West Fork River, which flows from the west to the east, is located about forty-five feet below claimants’ residence. The residence was originally built during the 1950's. In 1971, a bedroom was added to the residence. In 1991, claimants installed a septic tank behind their residence between the residence and the West Fork River. A garage, which was built about twenty to twenty-two years ago, is located on the east side of their residence. After a set of steps in front of the residence was washed away by water, claimants built a set
According to claimants’ son, Jeffrey Schrader, a flood occurred in 1985.
During the late 1980's, claimants began to experience considerable water run-off from U. S. Route 19. Jeffrey Schrader testified that the water appeared to resemble a “river coming down our front steps,” causing an accumulation of three to four inches of water in their front yard. After this water run-off began, claimants began to notice that the road surface was cracking and then it began sinking in one particular spot to a depth of about six to eight inches.
In 1993, claimants began to notice problems in the basement of their home. The basement wall on the north side of the house which faces U.S. Route 19 began to bulge toward the inside of the basement and cracks began to develop across the whole wall. The residence, which does not have guttering or down spouts, has had to have major repairs on two separate occasions.
In 1994, claimants determined that the wall on the north side of the residence facing the road was in a such a state of disrepair that they were required to rebuild the wall. This repair project took about two months to complete and cost approximately $10,000.00. Then in 1996, claimants were forced to undertake a second major construction project in an attempt to save their home from being pushed completely off its foundation. To accomplish this project, claimants' residence was placed on stilts and all four walls a long with the foundation were rebuilt. Claimants also had a foundation constructed for the storage building located to the west of the residence. This project took about three months to complete at cost of approximately $33,000.00.
Claimants contend that during the time beginning in 1989 or 1990 when the damage to their residence was occurring, they made telephone calls to respondent, wrote, letters, and personally contacted respondent on several occasions, but respondent did not take corrective measures until 1996. Jeffrey Schrader testified
Along U. S. Route 19, across the road from the Schrader residence on the north side, there is a ditch from which the water flows into a culvert beneath the surface of the road. This culvert continues beneath claimants’ driveway for one-hundred fifty to two hundred feet. Then the culvert and drain proceed down to the river bank. The ditch and culverts were installed by a contractor at the direction of respondent. In accordance with the terms of a 1996 contract with respondent, the contractor on the projects was required to clean the culverts on the road to alleviate a standing water problem. Claimants contend that this drain has been the source of the problems which have occurred to their residence.
The position of respondent is that it has not been negligent in the maintenance of the ditch line on U. S. Route 19. In 1991, the road was determined to be in a state of disrepair. When respondent discovered the condition of its roadway, it placed hot patch on the road surface. Ini 996, the road was repaved and respondent installed a retaining wall. The retaining wall consists of a whaler across the top of the frame with lagging between vertical piles which are anchored into the rock beneath the ground level about twenty-five feet.
Dr. Lyle K. Moulton, claimant’s geotechnical expert in soils and foundations, examined claimants’ property on four occasions from November 1997 - February 1999. It is his opinion that respondent has not responded properly to the cause of the landslide which affects not only claimants’ property but also U.S. Routel9. Dr. Moulton testified that the particular slide involved in this claim probably has existed since the late 1980's, but he was unable to identify what
Further, D r. M oulton t estified t hat t he 1 andslide a rea w as a ggravated b y respondent’s road work. The continued resurfacing of the pavement added a substantial thickness of material, which has a substantially higher unit weight than the soil itself. The existing limiting equilibrium system was aggravated by respondent’s maintenance of the road when it added more weight to the top of the slope by resurfacing the roadway, which caused further movement in the slope. A stability analysis performed by Dr. Moulton indicates that this situation took place over such a long period of time that there was sufficient movement in the slope so that the residual strength of the soil was mobilized.
Dr. Moulton rejected Dr. George A. Hall’s , a geotechnical engineer employed by respondent, expert opinion that the landslide is a retrogressive slide and began at the toe of the slope. Dr. Moulton asserts that his observations of the river did not indicate that the landslide starts from the bottom of the slope, rather it began at the top of the slope above the road. During his on site visits to the Schraders’ property, Dr. Moulton observed cracks in claimants’ residence proceeding down the slope. The basement wall has moved outward, but there is not much movement in the vertical face of the south wall. While the cracks on the residence appeared before the tension cracks, Dr. Moulton believed that the residence’s foundation, during construction, may have been the cause. Except for the tension cracks at the top of the road, there were no other scarps or clear signs of a step-wise failure. If the 1 andslide is a retrogressive slide, Dr. Moulton is of the opinion that it would have affected claimants’ residence before affecting the road. However, Dr. Moulton indicated that the road, not the Schrader residence, was affected. Further, Dr. Moulton asserts that Dr. Hall’s failure to depict the river level explained the destabilizing effect obtained by Dr. Hall’s stability analysis. All of the factors considered by Dr. Moulton led him to the conclusion that there was a progressive slide beginning at the road and moving toward the river bank. As this slide moves, it is causing the damages to claimants’ property and residence.
Dr. Hall is of the opinion that the landslide which is causing the damage to claimants’ property and to respondent’s road (U.S. Route 19) begins at the bottom of the slope. According to Dr. Hall, this slide apparently started in the mid-1980's and moved its way up the slope through claimants’ property to U.S Route 19. This particular slide is thus retrogressive in nature rather than progressive, i. e., the slide is moving up the slope rather than down the slope as is the usual scenario for slides. Dr. Hall asserts that Dr. Moulton admits that the peak strength of the soil would have existed before there was a landslide at that location. According to Dr. Hall, this admission supports his theory that the only place for a failure to occur was at the bottom of the slope. Using a stability analysis utilizing residual strength, Dr. Hall observed that there was no failure once the slip plane formed all the way to the road.
Dr. Hall testified that an important difference between his and Dr. Moulton’s expert opinions regards a scarp on the Schrader property. Dr. Moulton believes a scarp is a necessary sign of a retrogressive slide, while Dr. Hall believes that a scarp is not a necessary sign for a retrogressive slide. According to Dr. Hall, when the soil b elow p ulls a way, t here is s ome t ension a nd t he s oil c an e xpand. Cracks and deformations can develop in the soil. In the bottom portion of the slip, the material is being pushed and compressed. If material at the bottom moves and the support is removed at the bottom, then the slip can move further up the slope. Then, when there is a crack above, this moves slightly down the slope, removing support from material further up the slope and the landslide continues to progress further up slope with each step, creating what Dr. Hall described as a “domino effect.” If pressure is reduced, resistance is reduced for the next block of material, and the effect continues. Thus, a scarp is not necessary and is a matter of pressure between the different pieces of the eventual slide. He provided evidence of this opinion in photographs of the ground surface on the south side of claimant’s property near the West Fork River which revealed small cracks in the soil.
Additionally, Dr. Hall disagrees with Dr. Moulton that the patching placed by respondent on U.S. Route 19 aggravated the landslide. Dr. Hall is of the opinion that the pavement irregularities developed after the cracks formed south of the retaining w all c reating a m aterial v oid a nd c ausing t he m aterial f rom b ehind t he
The Court has held that respondent has a duty to provide adequate drainage of surface water, and drainage devices must be maintained in a reasonable state of repair. Haught vs. Dept. of Highways, 13 Ct. Cl. 237 (1980). In claims of this nature, the Court will examine whether respondent negligently failed to protect a claimant’s property from foreseeable damage. Rogers vs. Div. of Highways, 21 Ct. Cl. 97 (1996). In the claim of Mount v. DOH, Opinion issued January 28, 2000, this Court held that respondent was responsible for a slide occurring on claimant’s property when it continually placed asphalt on the road above claimant’s property without regard to the effect of the additional weight on the soil beneath the road surface. Although the slide was progressing from above the road, the weight of the road caused the slide to progress further below the road, causing damage to claimant’s property. Maintenance of the drainage ditch adjacent to the road allowed water to saturate the soil thus providing a slip plane for the slide. The claim herein presents a case of first impression for this Court as one of t he e xperts is of the opinion that the proximate cause of the damage to claimants’ property is the result of a retrogressive slide. This Court has not had a claim of that nature prior to the instant claim. However, after due consideration of the testimony of both experts, the Court has reached the conclusion that the evidence herein does make a case for a retrogressive slide rather than a progressive slide. The fact that there is evidence of cracking in the soil at and near the West Fork River; that the south basement wall of the house is beginning to fail again; the slope is elongating as the toe of the landslide is moving faster than the head of the landslide; and that there is evidence of the soil cracking at the south edge of the retaining wall all seem to the Court to substantiate the theory put forth by Dr. George Hall that this is in fact a retrogressive slide. It is an unusual phenomenon but the Court is of the opinion that Dr. Hall is correct in his analysis of the situation herein.
Further, the Court is of the opinion that respondent, once on notice of the situation on U. S. Route 19, took immediate and reasonable action to prevent any further drainage onto claimants’ property from the landslide and excess water flowing across the road onto their property. The Court finds that the terrain in this area of U. S. Route 19 is typical of many areas in West Virginia which are subject to landslides. In the instant claim, claimants have failed to established that respondent maintained U. S. Route 19, in Marion County, in a negligent manner. While the Court is sympathetic to the situation of claimants, the fact remains that there are many factors which have brought about this particular landslide problem affecting their property, including the unusually high water in 1985, the natural drainage area
In accordance with the finding of facts and conclusions of law stated herein above, the Court is of the opinion to and does deny this claim.
Claim disallowed.
The Court takes official notice of the fact that in 1985 heavy rainfall produced tremendous flooding in the area in question.
“Lagging” is material, usually timber or steel, that is placed between or behind the flanges of the piles in order to hold material that is secured.
A “stability analysis,” also known as a “Bishop analysis,” is a computer program that tries to determine the critical center circle that would produce the lowest factor of safety, which would be indicated by a value of “1.” This process is done by repeating the analysis many times, moving the center around and calculating the factor of safety for any circle through a particular point. The computer program keeps resolving the problem until it finds the lowest factor of safety, which is the minimum factor of safety for the particular analysis. Eventually ths program establishes where a landslide is occurring.
“Peak strength” is when the soil is loaded up, there is a stress strain response where the shear stress develops to a certain peak level. As the deformation continues it levels out, which leave the “residual strength,” which can be substantially below the peak strength.